New Children’s Hospital

One of the country’s most significant healthcare investments the New Children’s Hospital, will be the hub for paediatric care, research and training. 

Equipped with a high-spec ICT infrastructure throughout it’s vast campus, NCH will be a hospital of the future. Our bespoke BEMS control panels utilise a Niagara system to monitor, control and optimise energy usage throughout. An energy management system is  in place to record and analyse the relevant data. 

In 2018, our design team initiated design of BEMS panels for NCH. It has been a long and fulfilling journey to-date but one of which Ashdown Controls is proud to be part of. A major milestone was the final panel installed in May 2023. 

  • Over 50,000 points. 
  • 27,000+ hours recorded to-date. 
  • 650+ FCUs 
  • 303 control panels over 10 floors. 
  • 130 AHUs 

#heartofsmart #powerofmany

Project Details


Ashdown Control Systems

Main Contractor
BAM

Mechanical Contractors
Jones Engineering

M&E Consultant
ARUP

Status
Ongoing