ACS carried out the BMS supply and commissioning for the new Lidl Regional Distribution Centre in Newbridge.
The Centre M&E design involved the largest PV Array installation in Ireland. These PV Arrays will reduce the centre’s carbon output by 473 tonnes annually and will generate over 25% of the new facility’s energy.
![](https://ashdowncontrolsgroup.com/wp-content/uploads/2021/01/Lidl-Distribution-Centre-1.jpg)
![](https://ashdowncontrolsgroup.com/wp-content/uploads/2021/01/Lidl-Distribution-Centre-2.jpg)